Drive three concrete nails spaced at even intervals through each side of each hat channel.
How to drywall a concrete basement wall.
One common technique is to cover the block wall with drywall.
Tape a one foot by one foot square of plastic sheeting plastic kitchen wrap will do to the concrete wall in your basement with duct tape and leave it in place for 24 hours.
If the basement walls are made of poured concrete check for rust spots at the metal ties.
Trying to force a wall into place can raise the joists which could wreak havoc with drywall joints and flooring on the rooms above.
Insulate the foundation wall.
Drill a 1 1 2 inch deep hole in the wall on each pencil mark with a hammer drill and a masonry bit that is the same dimeter as a metal screw anchor sleeve.
Wish you could transform your basement into more useful living space.
Drywall is usually attached to wall studs with 2 inch drywall screws using an electric drill with a driver bit installed.
Tap a sleeve into each hole with a hammer.
If you see any use a hammer and center punch to drive the metal tie a inch into the wall.
Want the block wall in your basement to have a more finished appearance.
Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make sure you ve spaced the hat channels properly for the size of drywall and insulation you re using.
You can glue drywall sheets to a concrete block wall.
Shorter than the shortest measurement.
This campbell hausfeld project video will show you how to start a basement remodel by f.
However in some installations such as in a basement it is necessary to glue drywall sheets to the interior of concrete block walls.
Measure the distance from the floor to the joists at several locations and build your wall at least 1 4 in.
Nail on a 2 4 nailing strip using the chalk line to position the bottom of the strip.
Here are some tips to.
Use a drywall saw to cut outlet markings outside the lines on drywall image 1.
Secure the drywall to the studs image 2.
Mark a point 2 inches lower on the wall to allow space for the framing and drywall.
Mist the metal tie hole with water and use a margin trowel to apply hydraulic cement to plug each hole.
Allow the cement to dry.
Countersink the screws making sure to only dimple the paper.